| Sl No |
Name of Work |
Client |
Values (Rupees) |
| 1 |
MASW survey for Measurement of Dynamic Properties at Trinetra Project Site, Najaf garh, New Delhi |
M/s Civil Engineering Division, Department of Space, ISRO, Bangalore |
1,12,500 |
| 2 |
Geotechnical borehole data and analysis for Monorail Alignments- Bangalore |
M/s Geodesic Techniques Pvt. Ltd, Cantonment, Bangalore |
1,12,500 |
| 3 |
Geotechnical Investigation for water tank and multistoried buildings |
M/s Military Engineering Service, Bangalore |
1,70,000 |
| 4 |
Assessment of Seismic Safety of Thippagondanahalli Dam Structure |
B/s Bangalore Water Supply and Sewerage Board, Office of the Executive Engineer, Malleswaram, Bangalore |
5,23,925 |
| 5 |
Review Technical Report of Seismic Monitoring Studies in Tippagondahalli Dam site, Bangalore District |
B/s Bangalore Water Supply and Sewerage Board, Office of the Executive Engineer, Malleswaram, Bangalore |
20,000.00 |
| 6 |
Noise monitoring of Commercial Buildings |
M/s. Mudra Communications Private Limited, 25, Poornima State Bank of India Road, Bangalore 560001 |
1,10,300 |
| 7 |
Locating buried archaeological features using Ground Penetration Radar |
The Deputy Commissioner BIDAR and Archaeological survey of India- Darward |
4,00,000 |
| 8 |
Detection of soil heterogeneity using Ground Penetration Radar |
Consolidated Construction Consortium Ltd,JP Nagar, Bangalore 560-078 |
4,41,200 |
| 9 |
Suggestions and recommendations regarding ground improvement |
M/S WEG Industries Pvt Ltd Hosur. |
4,41,200 |
| 10 |
Site visits for seepage problems |
Mr.Balan/Ravi Bhatkal, Manish Meridian, RBI Colony Bangalore 560-024 |
22,472.00 |
| 11 |
Proof of concept using GPR in Secunderabad Railway Bridge |
M/s Apna Technologies & Solutions Private Limited,Chennai |
12,360.00 |
| 12 |
Seismic Hazard Assessment for the proposed Fast Breeder Reactor at BHAVINI, Kalpakkam IGCAR, |
Through Development Consultants Pvt. Limited, 191 Anna Salai,Chennai - 600 006 |
5,51,800 |
| 13 |
GPR and MASW Survey for the Study of distorted RE WALL at Anantpur, Andhra Pradesh NHAI, |
M/s. Continental Engineering Corporation,C-13 of NH-7 Project,Anantpur- 515001. A.P. |
5,51,800 |
| 14 |
GPR study on roads constructed using RBI Grade 81 materials |
Alchemist Technology Limited Alchemist House Building No.23, Nehru Place New Delhi-110019. |
15,79,282 April 2014 |
| 15 |
Mapping of Foundation and Rock depth using GPR at Krishna Temple, Hampi |
Archaeological Survey of India, Janpath- New Delhi |
4,43,822 |
| 16 |
Ground Penetration Radar (GPR) study to detect Cavities and Weak soil layers |
M/s City View Bangalore Properties Pvt Ltd.Bangalore 560-078 |
3,37,080 |
| 17 |
GPR study on railway track to map Ballast Penetration Depth |
Western Railway and RDSO Lucknow |
4,94,384 April 2015 |
| 18 |
Shear wave velocity measurement using MASW system at south western railway project site |
M/s. Patil Engineer’s & Contractor’s No-52 Lingraj Nagar,Near Samudya Bhavan Hubli |
100000 Dec 2013 |
| 19 |
GPR study on new and old roads |
Alchemist Technology Limited Alchemist House Building No.23, Nehru Place New Delhi-110019. |
2,24,720 April 2014 |
| 20 |
GPR study at Kannur International Airport Project (KIAL)- Section 1 L&T Transportation Infrastructure |
IC,Landmark-B, 6th Floor, Suren Road,Off. Andheri-Kurla Road, |
5,17,560 July -Sep 2015 |
| 21 |
GPR study at Kannur International Airport Project (KIAL)- Section 2 L&T Transportation Infrastructure |
IC,Landmark-B, 6th Floor, Suren Road,Off. Andheri-Kurla Road, |
9,74,700 Sept- Dec 2015 |
| 22 |
Subsurface Investigation by 2-D Multi Channel Analysis of Surface Wave Testing |
SECON Ltd Corporate Office, No 147, 7B Road EPIP, Whitefield Bangalore -560066, India |
9,08,600 Oct- Dec 2015 |
| 23 |
GPR study at Kannur International Airport Project (KIAL)- Section 3 L&T Transportation Infrastructure |
IC,Landmark-B, 6th Floor, Suren Road,Off. Andheri-Kurla Road, |
8,01,500 Dec 2015 - Jan 2016 |
| 24 |
GPR study at Kannur International Airport Project (KIAL)- Section 4 L&T Transportation Infrastructure |
IC,Landmark-B, 6th Floor, Suren Road,Off. Andheri-Kurla Road, |
6,10,300 Jan 2016-April 2016 |
| 25 |
Subsurface Investigation by 2-D Multi Channel Analysis of Surface Wave Testing at IGCAR Line 1-1 |
SECON Ltd Corporate Office, No 147, 7B Road EPIP, Whitefield Bangalore -560066, India |
8,55,300 May 2016-August 2016 |
| 26 |
GPR study at Kannur International Airport Project (KIAL)- Section 5 L&T Transportation Infrastructure |
IC,Landmark-B, 6th Floor, Suren Road, Off. Andheri-Kurla Road, |
10,96,910 May 2016-August 2016 |
| 27 |
Subsurface Investigation by 2-D Multi Channel Analysis of Surface Wave Testing at IGCAR at IGCAR Line 2-2 and 3-3 |
SECON Ltd Corporate Office, No 147, 7B Road EPIP, Whitefield Bangalore -560066, India |
6,83,000 June 2016-September 2016 |
| 28 |
Development of shear modulus and damping curves and liquefaction analysis of soil samples by carrying out dynamic and static tests |
Nuclear Power Corporation of India Ltd (NPCIL) A-1-19 Nabhikiya Urja Bhawan, Anushakti Nagar Mumbai-400094 |
45,160,50 October 16 -Feb 2017 |
| 29 |
GPR study at Kannur International Airport Project (KIAL)- Parallel Taxiway Section 1 L&T Transportation Infrastructure |
IC,Landmark-B, 6th Floor, Suren Road,Off. Andheri-Kurla Road, |
9,48,750 April -June 2017 |
| 30 |
Subsurface Investigation by 1-D Multi Channel Analysis of Surface Wave Testing to Measure Shear Wave Velocity up to 500 m at GHAVP site for NPCIL |
Nuclear Power Corporation of India Ltd (NPCIL)A-1-19 Nabhikiya Urja Bhawan, Anushakti Nagar Mumbai-400094 |
March -May 2017 |
| 31 |
GPR study at Kannur International Airport Project (KIAL)- Parallel Taxiway Section 2 L&T Transportation Infrastructure |
IC,Landmark-B, 6th Floor, Suren Road,Off. Andheri-Kurla Road, |
9,48,750 May -July 2017 |
| 32 |
Subsurface Investigation by 2-D Multi Channel Analysis of Surface Wave Testing to find sub surface at GHAVP site for NPCIL |
Nuclear Power Corporation of India Ltd (NPCIL)A-1-19 Nabhikiya Urja Bhawan, Anushakti Nagar Mumbai-400094 |
April -May 2017 |
| 33 |
GPR study at Kannur International Airport Project (KIAL)- Parallel Taxiway Section 3 |
L&T Transportation Infrastructure - IC,Landmark-B, 6th Floor, Suren Road,Off. Andheri-Kurla Road, |
9,48,750 May -July 2017 |
| 34 |
Site visit for observation of damages due to vibration and plan vibration measurement and design ground vibration isolation |
M/s Suprajit #100, Bommasandra Industrial Area Bangalore 560099 |
29,500 October 2017 |
| 35 |
Generation of subsurface profile with shear wave velocities measurement by passive and active MASW survey at selected locations in Indo Gangetic Basin. |
RMS Risk Management Solutions India Pvt Ltd 4th to 8th Floor, Elixir Business Park, Plot 15 A, Sector 127, Noida - 201301 |
3,13,880 Jan -Feb 2018 |
| 36 |
GPR study at Kannur International Airport Project (KIAL)- Parallel Taxiway Section 4 |
L&T Transportation Infrastructure - IC,Landmark-B, 6th Floor, Suren Road,Off. Andheri-Kurla Road, |
11,62,300 Feb -April 2018 |
| 37 |
Mapping of bedrock using integrated geophysical testing of Multichannel Analysis of Surface Wave and Ground Penetrating Radar |
Mfar Developers Pvt Ltd | # 3, Lavelle Road | Bengaluru 560 001 | Karnataka | India.www.mfar.com |
9,79,400 Jan -Feb 2018 |
| 38 |
GPR study at Kannur International Airport Project (KIAL)- Parallel Taxiway Section 5- Final |
L&T Transportation Infrastructure - IC,Landmark-B, 6th Floor, Suren Road,Off. Andheri-Kurla Road, |
7,69,850 March - May 2018 |
| 39 |
Measurement of dynamic properties using Multichannel Analysis of Surface Wave and Seismic Borehole Survey at Chennai Metro Rail Project |
M/s.SECON Ltd, Corporate Office, No 147, 7B Road EPIP, Whitefield Bangalore -560066, India |
5,66,400 July - Aug 2019 |
| 40 |
Incidences, Risk and Consequences of not having Complete Underground Utility Maps |
Dy. Accountant General (SS& LB),Office of the Principal Accountant General,Audit Bhavan, "C" Block, P.B.5398,Bengaluru -560001,India |
34,869,00 Oct-Dec 2019 |
| 41 |
Measurement of Dynamic properties using Cross Hole Seismic Test at Chennai Metro Rail Project |
M/s.SECON Ltd, Corporate Office, No 147, 7B Road EPIP, Whitefield Bangalore -560066, India |
2,95,000 Dec 2019-Jan 2020 |
| 42 |
Investigation Caved Canal Sections by Integrated Subsurface Exploration using MASW, GPR and Resistivity Imaging Surveys |
M/s. Visveswaraya Jala Nigam Limited (VJNL), Bangalore |
20,29,600 Feb-March 2020 |
| 43 |
Integrated Subsurface Exploration for Design of Generator Foundation at CPRI, Bangalore using Borehole, MASW, GPR and Downhole |
Central Power Research Institute (CPRI), Bangalore |
32,39,690 Mar-April 2020 |
| 44 |
Topographical survey and Geotechnical Investigation at AP High Grade Steels Limited |
M/s. AP High Grade Steels Limited, D. No. 294/1D, 100 Feet Road, Tadigadapa to Enikepadu, Kanuru Village, Penamaluru Mandal, Krishna District, Andhra Pradesh 521137 |
276,12,000 May-August 2020 |
| 45 |
Measurement of dynamic properties using Seismic Downhole Survey at Bangalore Metro Rail Project |
M/s.Sarathy Geotech and Engineering Services Pvt. Ltd., Bangalore |
3,30,400 June-July 2020 |
| 46 |
Weak Zone/Cavity Identification at Bangalore Metro L&T RT-02 Package Location using Integrated Subsurface Exploration |
L&T Construction-HCIIC Bangalore Metro RT02 Project Opposite to Granite Palace Lakkasandra, Bangalore-560030 |
10,47,250 Sep-Oct 2020 |
| 47 |
Investigation for the Caved Road Sections at Sultanji Gunta Road using Ground Penetrating Radar and Seismic Tests |
L&T Construction-HCIIC Bangalore Metro RT03 Project Opposite to Granite Palace Lakkasandra, Bangalore-560030 |
17,40,500 Sep-Nov 2020 |
| 48 |
Investigation of BMRC Tunnel Alignment 13400 to 13660 using Ground Penetrating Radar and Seismic Tests and Creating Subsurface Profiles by Integrated Approach |
L&T Construction-HCIIC Bangalore Metro RT02 Project Opposite to Granite Palace Lakkasandra, Bangalore-560030 |
43,42,400 Nove2020-Jan 2021 |
| 49 |
Integrated Geophysical testing to map subsurface heterogeneity and soil loss due to deep excavation next to Bosch House at Palace Road |
M/s. Bosch Bangalore through Jaden Developers 41/1 Sindhi Colony, Wheeler Road, Bangalore 560005 |
8,26,000 Octo 2021-Nove 2021 |
| 50 |
Resonant Column and Cyclic Triaxial Equipment and developing shear modulus and Damping Ratio curves of soil samples |
M/s. NPCIL, Mumbai through M/s.Cengrs Geotechnica Pvt. Ltd. Delhi |
29,50,000 Aug 2022-Dec 2022 |
| 51 |
Forensic Investigation of failure zone and strengthening measure to carryout High Power Laboratory Tests |
CPWD, Office of the Executive Engineer-I, 3rd Floor "A" Wing Kendriya Sadan, Bangalore 560034 |
23,64,700,Feb-2023-April-2023 |
| 52 |
Weak Zone/Cavity Identification at Bangalore Metro L&T RT-02 M.G.Road to Vellara station i.e., Chainage LAVI Tunnel- 11907.70 to 12474.78 using Integrated Subsurface Exploration |
L&T Construction-HCIIC; Bangalore Metro RT02 Project, Opposite to Granite Palace Lakkasandra, Bangalore-560030 |
17,70,000 Feb-2023-July -2023 |
| 53 |
Weak Zone/Cavity Identification below Raw Water Storage shed in UG Sump tank at Naidupeta A P |
Stedrant Technoclinic Pvt Ltd; #95, Sunvik Pride, Model House Street, Basavanagudi Bangalore:560004 |
11,80,000 March -2023-May-2023 |
| 54 |
Resonant Column and Cyclic Triaxial Equipment and developing shear modulus and Damping Ratio curves of soil samples |
M/s. L&T Construction-HCIIC, Bangalore Metro RT02 Project,Opposite to Granite Palace Lakkasandra,Bangalore-560030 |
17,70,000 March -2023-July-2023 |
| 55 |
Site Visit of Police Quarters at Binny Mill Bangalore to Study Restoration |
M/s. Karnataka State Police Housing & Infrastructure Development Corporation LTD,No.59,Gen.K.S.Thimmayya Road, Bengaluru- 560 025. |
59,000; October -November,2023 |
| 56 |
Site inspection of Block-1, Sector-L in NPKL to Study Restoration seepage area |
M/s. Assistant Executive Engineer, Bangalore Development Authority, No.4, Sub Division , Nadaprabhu Kempegowda layout Division, |
118,000;March -April,2024 |
| 57 |
Integrated Geophysical Investigation for condition assessment of V.V. Sagar Reservoir Dam using MASW, GPR and Down/Cross holes surveys |
Office of the Executive Engineer, M/s. Visveswaraya Jala Nigam Limited (VJNL), Chitradurga Camp |
39,73,100 Feb-2023-Sep 2024 |
| 58 |
PC00118: Integrated Investigation and Analysis for Feasibility of Restoration of Police Quarters at Binny Mill Bangalore |
M/s. Karnataka State Police Housing & Infrastructure Development Corporation LTD,No.59,Gen.K.S.Thimmayya Road, Bengaluru- 560 025. |
141,60,000,Sep-2024- August 2025 |
| 59 |
CP0077: Integrated Geophysical investigation at ISRO-SLC SAF Site, Thoothukudi, using MASW &ERT Surveys |
M/s. Indian Space Research Organisation. ISRO Headquarters Antariksh Bhavan, New BEL Road Bengaluru-560 094 |
45,05,240, Feb 2025- Apr 2025 |
| 60 |
CP0100: Site visit of Upper Bhadra Project Chitradurga Branch Canal Km:114.209 to km 116.171 aqueduct |
M/s. Visvesvaraya Jala Nigam Limited, O/o Executive EngineerUBP. Divno.5, Chitradurga |
1,18,000, Feb -March 2025 |
| 61 |
CP0107: Integrated Investigation to Validate Aqueduct Foundation Properties and Soil Properties suggestion for Aqueduct Pillar Foundation from P29 to P37 |
M/s. Visvesvaraya Jala Nigam Limited,O/o Executive Engineer,UBP. Divno.5, Chitradurga |
22,06,000,March 2025 -May 2025 |
| 62 |
PC00188:Preparation of Tomography of VV Sagar Dam using Integrated Investigation to Assess the Anomalies and Cavities in the Body Wall of the Dam |
Office of the Executive Engineer, M/s. Visveswaraya Jala Nigam Limited (VJNL), Chitradurga Camp |
99,85,160,Apr 2025 -March 2026 |
| 63 |
PC00200:Study of Effects of blasting on at Krishnaraja Sagara (KRS) Dam Structure due to quarries within a 20 km radius of the KRS Dam |
Executive Engineer,Cauvery Neeravari Nigama Limited, Krishnaraja Sagara Division, Krishnarajasagara.New Sayajirao Road, Mysooru 570024 |
476,72,000,June 2025- Ongoing |
| 64 |
CP0420: Hammer energy measuring in selected SPT equipment using SPT-HEMA and reporting |
M/s. Geologics Test House, 1st Floor, 45, Seerappaa Layout , Near Gangamma Gudi New Police Station, Lakshmipura Road Abbigere , Bangalore, Karnataka -560090. |
59,000; May 2026 -June 2026 |
| 65 |
CP0467: Site visit of Red mud pond of Alumina Refinery NALCO for taking up a study for raising the embankment height |
CGM (Env, TQM and TS maint)Alumina Refinery, NALCO |
59,000; July 2026 -August 2026 |
| 66 |
CP0478: Site Visit and Preliminary Field Testing for Forensic Investigation of RE wall Vibrations issues at Narasapura Industrial Area VUP Approach Slab |
M/s. SVS Mookambika constructions Ltd Flat No 401, 4th floor, H.No 28/A, Royal Arcadia, Sanjeeva Reddy Nagar, Hyderabad-500038, Telangana,India |
23,24,969; July 2026 -August 2026 |