Sponsored Projects
1. "Thermal distortion and vibration control of composite
laminates using piezoelectric elements", Space Technology Cell (STC),
IISc, Bangalore, (Completed, 2000-2002).
2. "Experimental
and Analytical Study on the Behavior of Fiber Reinforced Plastic (FRP)
Composite Reinforcements in Plain and Latex Modified Concrete Beam
Elements", Department of Science and Technology (DST), (Completed,
2000-2003).
3. "Experimental
and Analytical study on the Behavior of Reinforced Concrete Beam-Column Joints
with and without fibers under cyclic loading", Indira Gandhi Centre for
Atomic Research (IGCAR-IISc Cell), (Completed 2004-2007 ).
4. "Characterization
of Time dependent deformations in Concrete grades used in Nuclear Power
Plants", Board for Research in Nuclear Sciences (BRNS), Mumbai, (Completed
2004-2008).
5. "Optimal Design
of Axially Symmetrical Stiffened thin Shell Structures Under Buckling
Criteria", ISRO-IISc Space Technology Cell, (Completed, 2004-2006).
6. "Repair
Techniques in Reinforced and Prestressed Concrete Structural Components and
Assemblages", CSIR, New Delhi (Completed, 2004-2007).
7. "Condition
Monitoring of Railway Bridges", South Western Railways (Indian Railways),
(Completed 2006-2009).
8. "Fire resistance
and repair of earthquake damaged structures" (UKIERI Collaborative Project
Jointly developed with University of Edinburgh, IIT Roorkee and IISc,
Bangalore: Team: Professor Asif Usmani and colleagues from University of
Edinburgh, C S Manohar and Ananth Ramaswamy from IISc, and Professor P Bhargava
and colleagues from IIT Roorkee) (2008 -2011)
9.
Damage Assessment, Repair and Retrofit of Reinforced
Concrete Girders and Columns Using Fiber Reinforced Polymer Composite and
Cementitious Materials, CiSTUP-IISc, 2010-2012
10. Making Performance Based Structural Engineering for
Fire Resistance Attainable (UKIERI Collaborative Project Jointly developed with University of
Edinburgh and IISc, Bangalore: Team: Professor Asif Usmani and colleagues from
University of Edinburgh, C S Manohar, Ananth Ramaswamy Chandra Kishen and
Debraj Ghosh from IISc,) (2012 -2014)
11. Stochastic Modelling of Hydration Process in
Concrete investigations into creep and shrinkage Board of Research in Nuclear
Sciences (BRNS), Mumbai 2012-2016)
12. Development of a Model For Evaluating Prestress
Losses Considering Creep & Shrinkage Losses in Concrete & Relaxation
Losses In Steel Over 100 Years Board of Research in Nuclear Sciences (BRNS),
Mumbai 2012-2016)
13. Petro-graphical Chemical and Computational Studies
on Concrete at High Temperature Board of Research in Nuclear Sciences (BRNS),
Mumbai 2012-2016)
14. Prof. Ananth Ramaswamy (PI) and Prof. Debashish Roy (C-PI) Dr. Elizabeth John (R), Dr Donna Mathews, Dr. Santhosh (VSSC, ISRO) “Response of Adhesive Bonded Laminate Composites to Thermo-Mechanical Loads, IISc-ISRO, Center for Excellence, (2018-2023).
1. Prof. Ananth Ramaswamy (2020-21)
Proof Checking of Design and Drawings of Four Lane ROB and it’s approaches at
LC48E/C on NH205, in Andhra Pradesh, M/s Krishi Infratech. Task involved review
of analysis and Design and Drawings of road over bridges for compliance with
applicable codal provisions. Status-in progress.
2. Prof. Ananth Ramaswamy (2021)
Proof Checking of Design and Drawings of the UHPFRC Bridge at Kashedi Ghat,
Maharashtra, M/s ILF Mumbai. Task involved review of analysis, designs and
drawings for the substructure and foundations made using conventional RCC, and
the super structure comprising of precast dry jointed post tensioned UHPFRC
(New Material) U-box elements and conventional cast in-situ RCC slab composite
superstructure system. Status-Completed.
3. Prof. Ananth Ramaswamy (2020)
Proof. Checking of Trumpet Interchange Road Over Bridge widening Near Bangalore
Airport. M/s Vijay Nirmana Construction., Bangalore. Task involves assessing
the design and drawings of the road over bridge sections being developed for
widening the sections as an independent unit for compliance with applicable
codal provisions. Status-Completed.
4. Prof. Ananth Ramaswamy (2020)
Proof Checking of Design and Drawings for the construction of the Kempegowda
Statue in Bangalore, M/s Ram Sutar Creations New Delhi. Task involved Review of
the analysis, design and drawings for the supporting framework needed to
support the façade 108 feet tall statue of Nada Prabhu Hiriya Kempe
Gowda-Coming up at Bangalore International Airport, for compliance with applicable
Codal provisions. Status-Completed
5. Prof. Ananth Ramaswamy (2020)
Proof Checking of Design of Control Cabin and Security room of M/s GAIL India
Hubli”, M/s Sharda Infra Engineers, Hubli. Task involved Review of the design
and drawings of the building for compliance with applicable codal provisions.
Status-Completed.
6. Prof Ananth Ramaswamy (2020)
Proof Checking of design and drawings for a G+4 Police Station in Quepem, Goa,
M/s Shivam Infratech. Task involved review of analysis and Design of the
building for compliance with applicable codal provisions. Status-Completed.
7. Prof. Ananth Ramaswamy (2019-20)
Proof Checking EWS Housing in Ejipura, Bangalore M/s Garuda, Bangalore. Task
involved assessing the analyses and design of three towers of EWR Housing in Eijapura
Bangalore for compliance with applicable codal provisions. Status-Completed.
8. Ramaswamy, A. (2016) Proof
Checking designs for a 250m Steel Transmission Line Tower, M/s BEL, Bangalore.
9. Ramaswamy A. (2015) Design
Reviews of in-House Analysis and Design of Tech-Box Structures at Design
Interchange in Marthahalli, Bangalore, M/s Reinforced Earth, Bangalore.
10. Ramaswamy, A. (2014) Evaluate the
Design Concept of ECBCDC Construction Concept, M/s Chetna Construction,
Bangalore.
11. Ramaswamy A. (2014) Design
Reviews of in-House Analysis and Design of Tech-Box Structures at Design
Interchange in Marthahalli, Bangalore, M/s Reinforced Earth, Bangalore.
12. Chandra Kisan and Ramaswamy, A.
(2013) Proof Checking of One Road Over Bridge Chainage km 131-860 on
NH207, M/s Transtroy, Devanhalli, Bangalore.
13. Chandra Kisan and Ramaswamy, A.
(2013) Proof Checking of One Road Over Bridge Chainage km 83-816 on
NH207, M/s Transtroy, Devanhalli, Bangalore.
14. Chandra Kisan and Ramaswamy, A. (2013)
Proof Checking of One Road Over Bridge Chainage km 101-801 on NH207, M/s
Transtroy, Devanhalli, Bangalore.
15. Chandra Kisan and Ramaswamy, A.
(2011-12) Proof Checking of One Road Over Bridge Chainage km 197.0303
Kannur-Vengalam-Kutipuram Section of NH17 M/s Scott Wilson, Bangalore..
16. Chandra Kisan and Ramaswamy, A.
(2011-12) Proof Checking of One Road Over Bridge Chainage km 187.034
Kannur-Vengalam-Kutipuram Section of NH17 , M/s Scott Wilson, Bangalore..
17. Chandra Kisan and Ramaswamy, A.
(2011) Proof Checking One Road Over Bridge Between Yelahanka and
Krishnarajapuram, Bangalore, National Highways.
18. Ramaswamy A. (2011) Design
Reviews of in-House Analysios and Design of Tech-Box Structures, M/s Reinforced
Earth, Bangalore..
19. Chandra Kishan and Ramaswamy, A.
(2010) Proof Checking of One Bridge over Krishna River at km 740, M/s India
Infrastructures Engineers, LTD.
20. Chandra Kishan and Ramaswamy, A.
(2010) Proof Checking of Two Box Type Road Bridges in
Bijapur Section of National Highways.
21. Chandra Kishan and
Ramaswamy (2010) Proof Checking of Two Prestressed Concrete Road Bridges in
Bijapur Section of National Highways.
22. Chandra Kishan and
Ramaswamy, A. (2010) Proof Checking Four RC Road Bridges in Bijapur Section of
National Highways, M/s KNRCL.
23. Chandra Kishen and
Ramaswamy, A. (2010) Proof Checking of One Road Under Bridge and Two Road Over
Bridges in Mangalore Udupi Section, M/s National Highways, GOI.
24. Chandra Kishan and
Ramaswamy A. (2009) Proof Checking of Temporary Support Structures needed for
casting and Moving Road Over Bridge Elements, M/S KNR Constructions, Bangalore.
25. Chandra Kishan and
Ramaswamy, A. (2009) Proof Checking and Repair of Air India SATS Cargo Complex,
BIAL, Bangalore, M/s L$T ECC Constructions, Bangalore.
26. Chandra Kishen and
Ramaswamy, A. (2009) Proof Checking of one Road Over Bridge Secttion
Salem-Undelpet Section of NH7 M/s Scott Wilson, Bangalore.
27. Chandra Kishen and
Ramaswamy, A. (2008) Proof Checking of Temporary Support Structures needed for
casting and Moving Road over Bridge Elements (2008), M/s Feedback Ventures, NH7
at 514/163.
28. Rao, A.R.K. and
Ramaswamy, A. (2008) Proof Checking Designs of Underground watertanks, at
Kavaloor, Benikopa, Thondial and Kavanoor, M/s Katnataka Land Army Corporation.
29. Chandra Kishan and
Ramaswamy, A. (2008) Proof Checking of Road Over Bridges on Bangalore-Selam
Section of NH7 National Highways.
30. Raghu Prasad, Chandra
Kishan, and Ramaswamy, A (2007). Proof Checking of Three Road Over Bridges at
km 508/129, 517/806, 524/263 on NH7 M/s Feedback Ventures, Bangalore.
31. Chandra Kishan and
Ramaswamy, A. (2007) Proof Checking of Two (Curved) and one Straight Road over
Bridges at km 16/385 near Bangalore international Airport, M/s L & T
ECC, Constructions., Bangalore.
32. Ramaswamy, A. and
Chandra Kishan, J.M. (2006) Project Report on “Expert review of highway
interchange at Hosur road at chain-age 16.345”, Bangalore, Nandi Infrastructure
Corridor Enterprise Limited, Bangalore.
33. Srinivasa Murthy,
B.R., and Ramaswamy, A. (2005) Rehabilitation of the existing Brick Masonry
Arch Bridge Across Vrishabhavathy River on Magadi Road, Bangalore
Mahanagarpallike.
34. Srinivasa Murthy,
B.R., and Ramaswamy, A. (2002) Retrofit Measures to the Nethravathi steel truss
bridge at KM 327 of National Highway 48, Bangalore-Mangalore Section,
Department of Public Works Government of Karnataka, October.
35. Chandra Kishen, J.M.,
Ramaswamy, A. and Nanjunda Rao, K.S. (2002) Review of Designs for Brigade
Software Park, Block B, Banashankari, Bangalore, Brigade Group Constructions,
Bangalore.
36. Ramaswamy, A, and
Chandra Kishen, J.M., (2001) Analysis of Bamboo-Wood-Concrete Composite
Beams, International Network of Bamboo Rattan (INBAR), Beijing, China,
February, 2001.
37. Raghu Prasad, B.K.,
Ramaswamy, A., Chandra Kishen, J.M. and Nanjunda Rao, K.S. Determination of
Tensile Bond Strength Between Old and New Concrete and Pull out Strength of
Shear Lugs, Karnataka Power Corporation Ltd., April 2001.
38. Ramaswamy, A., Raghu
Prasad, B. K., and Nanjunda Rao, K. S. (1999). "Certification of quality
of epoxy bonding agent used in pre-cast match cast segmental
construction." M/s Fosroc Chemicals (India) Ltd., Bangalore, INDIA.
December 1999.
39. Chandra kishen, J.
M., and Ramaswamy, A. (1999). "Structural analysis / adequacy of shear
keys provided for Markandya Dam Project." Koimattur and Bellad Associates,
Dharwad, INDIA. October 1999.
40. Ramaswamy, A., Raghu
Prasad, B. K., and Nanjunda Rao, K. S. (1999). "Certification of quality
of epoxy bonding agent used in pre-cast match cast segmental
construction." M/s Sanfield India Ltd., Bhopal, INDIA. June 1999.
41. Ramaswamy, A., Raghu
Prasad, B. K., and Nanjunda Rao, K. S. (1998). "Certification of quality of
epoxy bonding agent used in pre-cast match cast segmental construction."
M/s Fosroc Chemicals (India) Ltd., Bangalore, INDIA. June 1998.
42. Ramaswamy, A., Raghu
Prasad, B. K., and Nanjunda Rao, K. S. (1998). "Certification of quality
of epoxy bonding agent used in pre-cast match cast segmental
construction." M/s Fosroc Chemicals (India) Ltd., Bangalore, INDIA.
February 1998.
43. Ramaswamy, A., Raghu
Prasad, B. K., and Nanjunda Rao, K. S. (1998). "Certification of quality
of epoxy bonding agent used in 2.5 Km long pre-cast match cast segmental
via-duct over Mysore Road." M/s Larsen & Toubro Ltd., ECC (Const.)
Group, Bangalore, INDIA. February 1998.
44. Ramaswamy, A., Raghu
Prasad, B. K., and Nanjunda Rao, K. S. (1998). "Certification of quality
of epoxy bonding agent used in 2.5 Km long pre-cast match cast segmental
via-duct over Mysore Road." M/s Larsen & Toubro Ltd., ECC (Const.)
Group, Bangalore, INDIA. October 1997.
45. Ramaswamy, A., Raghu
Prasad, B. K., and Nanjunda Rao, K. S. (1998). "Certification of quality
of epoxy bonding agent used in 2.5 Km long pre-cast match cast segmental
via-duct over Mysore Road." M/s Larsen & Toubro Ltd., ECC (Const.)
Group, Bangalore, INDIA. June 1997.
46. Ramaswamy, A., Raghu
Prasad, B. K., and Nanjunda Rao, K. S. (1998). "Certification of quality
of epoxy bonding agent used in 2.5 Km long pre-cast match cast segmental
via-duct over Mysore Road." M/s Larsen & Toubro Ltd., ECC (Const.)
Group, Bangalore, INDIA. May 1997.
47. Manohar, C. S., and
Ramaswamy, A. (1996). "Dynamics of mechanically launched bridges, Final
report to Ministry of Defence, RDE (Engineers), Pune, INDIA.